Loadbank Testing 20227

April 30, 2017  •  Leave a Comment

20227 was loadbank tested last Friday to smooth out the all or nothing power application which had been getting progressively worse and unpredictable. The loco was connected to our load-bank and set up to bypass the slow speed control, the load regulator reset with non slow speed circuit boards and the governor switches reset.

The wiring has been left so slow speed can be reinstated in future if required, but as the loco now runs perfectly with smooth progressive power delivery it will be unlikely we will be fiddling with it anytime soon. 

Thanks to Lee and Tim for their hard work resolving this issue once and for all

 


Comments

No comments posted.
Loading...